Click Here To View Another Inspection Inspection #: 681225 Inspection Type: CIP Preclosure Inspector: H.Kahlstrom Result: Approved Comment: Rebar placement at shear wall basement to level 1 G-H/1 and level 1 to mezzanine F.9/3-4. See S.I. report. Inspection Corrections DateStatusCodeDescriptionRefLocationComments