Click Here To View Another Inspection Inspection #: 676838 Inspection Type: Foundation Inspector: H.Kahlstrom Result: Approved Comment: Rebar at N. Elevator pit and slab at grid lines 1.2-2.2/G-H. Double mat is complete and bars extending into step for connection at slab later. Strip footings are in place with all reinforcement present. Basement shear wall reinforcement is present with all rebar in place per plan #8 @ 12" o.c. each way with #6 bars continuing through slab at ceiling at 12" o.c. Steel columns at each end of shear wall have nelson studs at 8" o.c. per plan. Inspection Corrections DateStatusCodeDescriptionRefLocationComments