Click Here To View Another Inspection Inspection #: 676796 Inspection Type: Final Mechanical Inspector: Y.Dovba Result: Correction Comment: Mechanical Final Approved. Chillers, booster pumps and mechanical equipment with all associated piping to include chillers and domestic and heat piping complete. Deferred submittals in hand for all equipment exceeding 400lbs including equipment outside (Concourse B & C HVAC upgrade) Per plans M2.5 & M2.6. NOTE: Please label piping and call for reinspection. Inspection Corrections DateStatusCodeDescriptionRefLocationComments 4/29/2022CorrectedMechFinalSee commentsSee Inspector CommentsAll new piping must be labeled. Per 2018 IMC section 308.1 all piping must be labeled and direction of flow indicated as well.