Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 672566
Inspection Type: Final Fire Inspection
Inspector: T.Furch
Result: Correction
Comment: Need a fire inspection on the new temp pedestrian tunnel at level 1 parking garage to terminal. Requested by: Grady Putman 227-6445 Gputmam@rhcak.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
8/10/2021TransferFire 19Correction(s) #6Please correct the following: This inspection may not include all issues required to obtain a CCO.
8/10/2021TransferFire 18Correction(s) #5Please correct the following: verify functionality of newly installed/relocated fire alarm devices in and adjacent to tunnel. Test in presence of inspector or provide affidavit of install & testing of devices.
8/10/2021TransferFire 17Correction(s) #4Please correct the following: Tunnel construction does not appear to be compatible with building construction.  Use of wood studs & walls if allowed are typically required to be covered with sheet rock and/or sprinklered.
8/10/2021TransferFire 15Correction(s) #2Please correct the following: Complete construction to a level that is safe for public to include cover open wiring @ elevator lobby, remove tape over smoke detectors for elevator @ all levels. repair inop emergency light in tunnel, complete all tunnel framing, walls, & interior finish ratings.
8/10/2021TransferFire 16Correction(s) #3Please correct the following: Plastic sheathing used as dust barrier is required to meet IFC chapter 8 for interior finish for smoke development & flame spread.  Submit documentation prior to install.  Remove materials that are not approved or do not meet requirements.
8/10/2021TransferFire 13Correction(s) #1Please correct the following: Clarify scope of work.  Provide tunnel safety plan & details to include any approved change orders.
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS