| Date | Status | Code | Description | Ref | Location | Comments |
| 12/8/2021 | | FireSprnkRoughOther | Fire Sprinkler Rough Partial Approval | Fire Sprinkler Rough Partial Approval. List area(s) approved | | Pre-rock inspection for pipe installed at the soffit at tunnel #124. Made a walkthrough with Argus on exit vestibule conditions. Will need to investigate installation of coverage if required. |