Click Here To View Another Inspection Inspection #: 666160 Inspection Type: Framing / Int. Inspector: H.Kahlstrom Result: Approved Comment: Shear nailing interior corridors - both plate nailing and interior shear. Levels 2-4 floor strapping is complete per plan. NOTE: Anchor bolt testing and grout was verified by special inspector, see report. Inspection Corrections DateStatusCodeDescriptionRefLocationComments