| Date | Status | Code | Description | Ref | Location | Comments |
| 3/1/2021 | | Fire 2 | CCO approval | Fire Final approved for CCO | | CCO approved for setup of the office space till March 15th 2021. |
| 3/1/2021 | | Fire 13 | Correction(s) #1 | Please correct the following: | | <div>Training room 123 has an occupant load of 88 occupants and required Emergency lights, exit signs and panic hardware. Architect has the room as an A Occupancy with an occupant load factor or 15 sq.ft per person. If the room is reclassified as it may not required equipment. </div><div><br></div><div>Contractor need to reach out to EIC at0561-5543 for project 19-0033.01</div> |
| 3/1/2021 | | Fire 15 | Correction(s) #2 | Please correct the following: | | Fire alarm layout is not code compliant for ADA layout for Visable alarm for public use areas and common use areas per 2012/2018 IFC 907.5.2.3.1 and NFPA 72, the wall strobes are obstructed by the cubicles and do not meet the intent of providing visual notification to hearing impairs people. Multiple areas have no strobe coverage. Have a fire alarm system company evaluate, provide design and permit to install compliant coverage. |
| 3/1/2021 | | Fire 16 | Correction(s) #3 | Please correct the following: | | Unable to test existing exit lights and emergency lighting. Contractor unable to locate breakers. Identify breaks so emergency systems can be tested. |