| Date | Status | Code | Description | Ref | Location | Comments |
| 2/19/2021 | | Fire 15 | Correction(s) #2 | Please correct the following: | | Area B not ready for inspection |
| 2/19/2021 | | Fire 13 | Correction(s) #1 | Please correct the following: | | Training room 123 has an occupant load of 88 occupants and required Emergency lights, exit signs and panic hardware. Architect has the room as an A Occupancy with an occupant load factor or 15 sq.ft per person. If the room is reclassified as it may not required equipment. <br><div><br></div><div>Contractor need to reach out to EIC at0561-5543 for project 19-0033.01</div> |
| 2/19/2021 | | Fire 2 | CCO approval | Fire Final approved for CCO | | CCO Approved for area "A" till March 1, 2021 |