| Date | Status | Code | Description | Ref | Location | Comments |
| 10/23/2020 | Transfer | firealarm13 | Please correct the following | Please correct the following: | | Provide change order for solution to low decibel's in office areas with no speakers. |
| 10/23/2020 | Transfer | firealarm3 | Decibel report | Provide Decibel Level Report. | | Provide decibel report for all glass offices that do not have speakers installed in them on floors 4, 9 and 12. During testing of the 9th floor several offices did not meet the minimum 60 dBA on the alert tone as required by local amendment 23.45.907.5.2.1.1. <div><br></div><div>During the test 2 to 3 speakers were taken from 1/2 watt to 2 watts to make 60 dBA in the office, but it caused the amplifier to be over loaded. Designer and building owner need to evaluate on adding speakers to offices or adding additional amplifiers to allow for speaker wattage to be increased. Note: increased wattage may cause a decrease in voice intelligibility. </div> |
| 10/23/2020 | Transfer | firealarm2 | Install cert |
<p class="MsoNormal"><font face="Times New Roman">Provide Installation Certification and test report.</font></p>
| | Provide fire alarm install certification |
| 10/23/2020 | Transfer | firealarm11 | Fire Alarm approved CCO | Fire Alarm approved for CCO | | CCO approved for floors 4, 9 and 12 fire alarm till December 31, 2020 |