Click Here To View Another Inspection Inspection #: 630053 Inspection Type: Bottom of Hole Inspector: H.Kahlstrom Result: Approved Comment: BOH is clean compacted material at the East interior footing area. The footing between columns has been cut flush with the interior side of the exterior wall to accommodate a new grade beam and concrete shear wall. The elevation is approximately 6'-2" below FF to accommodate a rat slab that will support the reinforcement for the grade beam. The BOH is approved for placement of material. Inspection Corrections DateStatusCodeDescriptionRefLocationComments