Click Here To View Another Inspection Inspection #: 624362 Inspection Type: Framing / Ext. Inspector: H.Kahlstrom Result: Approved Comment: West High 8-11-20 Inspected 6” metal stud parapet framing per details 3/A8.01 and 4/S5.3 at the following locations. Grid 4.6 between B.5 to C.9, Grid B.5 between 4.6 to 5.1 Grid 5.2 between C.9 to B.5 and Grid C.9 between 5.2 to 5.6. All 14ga. bottom track was attached with (2) 1/4” x 1-3/4” Tapcon concrete screws every 8”. The interior plywood sheathing was attached with 2351A versapin nails at 4” centers at all locations except at bottom track which was attached with 2359N versapin nails at 4” centers. Inspection Corrections DateStatusCodeDescriptionRefLocationComments