Click Here To View Another Inspection Inspection #: 623100 Inspection Type: Framing / Ext. Inspector: H.Kahlstrom Result: Approved Comment: West High 8-3-20 Inspected 6” x 24” 20 ga metal stud parapet framing installed at 16” centers with a 14ga bottom track attached with 1/4” x 2-1/2” sds screws (2) every 8” at the following location. Grid D.3 between 5.1 and 6.2. Interior 1/2” cdx plywood was attached on 4” centers at panel edges and in the field with versapin nails utilizing the 2351A at all locations except bottom track in which the 2359N Nail was used. Also inspected 6” x 24” 20 ga metal stud parapet framing installed at 24” centers with a 14 ga bottom track attached with 1/4” x 1-3/4” tapcon concrete anchors (2) every 8” at the following locations. North edge of roof J-6 and J. Gridlines 5.3 between E1 and E3 grid E1 between 5.1and 5.3 grid 5.1 between C.9 and E.1 the interior sheathing was installed at these locations as well in the same fashion aforementioned. Additional parapets of the same configuration as previously mentioned were also installed at the following locations. Grid C.9 between 4.6 and 5.1 grid 4.6 between B.5 and C.9 Inspection Corrections DateStatusCodeDescriptionRefLocationComments