Click Here To View Another Inspection Inspection #: 622369 Inspection Type: Footing Inspector: thomas.green Result: Approved Comment: Inspection for interior concrete pads rebar and perimeter helical pile installation/ grout installation. Rebar approved for four pads in South unit crawlspace. Piles installed, ok to backfill. Pile log and closure letter from EOR required at time of final inspection. Requested by: josiah 2183932283 josiah.trout@akrbps.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments