Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 622325
Inspection Type: Roof Nailing
Inspector: H.Kahlstrom
Result: Approved
Comment: Inspection is for roof sheathing attachment nailing and associated hardware. Grids C.3-D.9 and 6.4-6.2 on L roof : 1/2" plywood attached with .148 X 2 3/8" galvanized nails. ^" o.c. in the field and 2" on all panel edges. CMSTC16 strapping is installed across the roof diaphragm each direction at 6'-0" o.c. with ends terminated in marriage straps and HTT5 tension ties anchored to the concrete curb with galvanized threaded rod and epoxy. Parapet framing and sheathing grid 6.2 between D.9 and E.4 is complete with tapcons 2 (ea) at 8"o.c. and versapins into sheathing per plan. See S.I. report.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
       