Inspection #: 618854
Inspection Type: Final Electrical
Inspector: E.Widman
Result: Partial
Comment: Requesting PM inspection Please call Jay @ 301-2247 20 minutes prior to coordinate a site meeting Requested by: David Nickerson 9072772966 consolidatedconeng@gmail.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
8/18/2020TransferCorrect Below* Gate control cabinet. Label requires 20 amp rated supply circuit. 40 amp currently installed.
7/8/2020TransferCorrect Below* Panel schedules.Label spare breakers. Verify labelling of panel source of supply.
7/8/2020CorrectedCorrect Below* Drawing.Shows 40A breaker supplying MOVs. 50A breaker installed.
7/8/2020TransferCorrect Below* Underground j-box metal lid by transformer and panel H-frame.Bonding strap not properly connected to grounding system in box. Use Copper C.
7/8/2020CorrectedCorrect Below* H-frame pilings driven 20+ feet into the ground.These qualify as grounding electrodes and are required to be connected to transformer XO by a #4 GEC.
7/8/2020CorrectedCorrect Below* GRC isolated sections emerging from grade below H-frame for XFMR and panel.GRC isolated from metal panels, transformer by liquidtite requires external bonding jumpers around the liquidtight.
7/8/2020CorrectedCorrect Below* Transformer.No connection from GEC to XO.