| Date | Status | Code | Description | Ref | Location | Comments |
| 7/8/2020 | Transfer | Correct Below | * | | Panel schedules. | Label spare breakers. Verify labelling of panel source of supply. |
| 7/8/2020 | Transfer | Correct Below | * | | Drawing. | Shows 40A breaker supplying MOVs. 50A breaker installed. |
| 7/8/2020 | Transfer | Correct Below | * | | Underground j-box metal lid by transformer and panel H-frame. | Bonding strap not properly connected to grounding system in box. Use Copper C. |
| 7/8/2020 | Transfer | Correct Below | * | | H-frame pilings driven 20+ feet into the ground. | These qualify as grounding electrodes and are required to be connected to transformer XO by a #4 GEC. |
| 7/8/2020 | Transfer | Correct Below | * | | GRC isolated sections emerging from grade below H-frame for XFMR and panel. | GRC isolated from metal panels, transformer by liquidtite requires external bonding jumpers around the liquidtight. |
| 7/8/2020 | Transfer | Correct Below | * | | Transformer. | No connection from GEC to XO. |