Click Here To View Another Inspection Inspection #: 614737 Inspection Type: Ceiling Rough Electrical Inspector: M.Green Result: Partial Comment: *2nd floor offices 201C, 201D; 2nd floor conference rooms 201E and 202: New troffer lighting. *2nd floor corridor C201 retrofitted emergency battery pack lighting. *Panel 1LS1 and panel 1LK: new feeder conduits to distribution panel "Service 3" *(2) large AHUs: Conductors intercepted at 2nd floor gutter and re-piped to distribution panel "Service 3". Electrical rough approved. Inspection Corrections DateStatusCodeDescriptionRefLocationComments