Click Here To View Another Inspection Inspection #: 610712 Inspection Type: Framing / Int. Inspector: H.Kahlstrom Result: Correction Comment: Phase 2 framing 12th floor is complete. Inspection Corrections DateStatusCodeDescriptionRefLocationComments 5/11/2020TransferINTFRAMEBInterior framing correctionComplete the following correctionsPhase 2 ADA restroomProvide fire stop and special inspection at through penetrating items.