| Date | Status | Code | Description | Ref | Location | Comments |
| 4/23/2020 | Transfer | 01 | See inspection comments | | Physical protection required for conduit entries containing #4 or larger conductors. | |
| 4/23/2020 | Transfer | 01 | See inspection comments | | Flexible cord terminations at splice from building wire to bridge and at power distribution box. | Terminations approved for use required at flexible cord stranded conductors. |
| 4/23/2020 | Transfer | 01 | See inspection comments | | exterior interconnection. | Flexible cord not permitted to be concealed within building. |