Click Here To View Another Inspection Inspection #: 607699 Inspection Type: Final Plumbing Inspector: G.Stuller Result: Approved Comment: 4 ea. temporary mop sink rough and final in phase 1 inspected and APPROVED. OK FOR CO FROM 4-15-2020 THROUGH 7-15-2020. *All pressure test were done @ system operating pressure. City water for domestic water pressure, and forced waste system used for DWV pressure test* Inspection Corrections DateStatusCodeDescriptionRefLocationComments