| Date | Status | Code | Description | Ref | Location | Comments |
| 9/17/2020 | Transfer | EC1 | Correct Below | | phase 3 | All low voltage cabling in ceiling must be supported above the grid. |
| 9/17/2020 | Transfer | EC1 | Correct Below | | phase 3 | Unused low voltage cabling in ceiling must be flagged and labeled or removed if abandoned. |