| Date | Status | Code | Description | Ref | Location | Comments |
| 2/27/2020 | Transfer | Correct Below | * | | New sink/prep area. | Verify readily accessible GFCI protection is provided for receptacles in this location. Not tested while onsite, not certain of protection method (Breaker location) and ability to reset receptacles. |
| 2/27/2020 | Transfer | Correct Below | * | | Panel schedule. | Update panel schedule for new circuits related to work. |
| 2/27/2020 | Transfer | Correct Below | * | | Above ceiling. | Lighting outlet required at equipment requiring servicing. |
| 2/27/2020 | Transfer | Correct Below | * | | | Flexible cord not permitted to be concealed in building. Chapter 3 wiring method required. |
| 2/27/2020 | Transfer | Correct Below | * | | Provide installation instructions for equipment. | |
| 2/27/2020 | Transfer | Correct Below | * | | New counter area. | Provide MOA stamped reviewed plans for inspections. Plans provided do not appear to include new cooler. |