Click Here To View Another Inspection Inspection #: 587917 Inspection Type: Final Structural Inspector: P.Calhoun Result: Correction Comment: POC onsite: Jeremiah Trevelyan c. 632-0069 Work is located on the Mezzanine level of area F (4th Floor SE) Please coordinate with Final Fire Inspection for everyone's convenience. Requested by: Mike T. Gould 9072421064 mike.t@excelak.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments 2/5/2020TransferFNLSGFinal Structural OtherPlease correct the following: Repair damaged SAFP on column near new ladder