Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 584502
Inspection Type: Final Plumbing
Inspector: K.Hanson
Result: Correction
Comment: Partial Plumbing Final - Approved Plumbing scope related to Klebs Mechanical kitchen remodel complete. CCO given for kitchen only, expires 2-6-20. Previous corrections related to rest of building still remain, full Plumbing Final will not be issued until corrections are addressed.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
9/26/2019TransferPlumbFinal6ADA RequirementsFixtures are not installed per ADA requirements-Per ANSI A1171.1 codepublic lavsASSE 1070 mix valves required serving hot side.
9/26/2019TransferPlumbFinal6ADA RequirementsFixtures are not installed per ADA requirements-Per ANSI A1171.1 codePublic/ADA WCsFlush handle shall be located on open side of room/stall & seat shall be of open front style.
9/26/2019TransferPlumbFinal17Backflow Preventer RequiredAn approved backflow preventer is required-UPC 602.2LaundryProvide documentation commercial clothes washing machines have backflow prevention precautions regarding chemical injection.
9/26/2019TransferPlumbFinal2Caulk FixturesFixture(s) shall be caulked-407.2WC/lav/urinalCaulk required where fixture/countertop meets wall/floor.
9/26/2019TransferPlumbFinal13Reversed WaterHot and cold water is reversed-UPC 415.0Multiple shower valves 
9/26/2019TransferPlumbFinal1WaterTempTub/Shower<em>Tub/shower water temperature is required to be between 110-120 degress fahreneit- UPC 418 and local amendment 419</em>Multiple shower valves 
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS