| Date | Status | Code | Description | Ref | Location | Comments |
| 7/30/2019 | | FireOtherOther | Correction(s) #1 | Please correct the following item(s): | | <p>CCO approved for 30 days (expires 08/30/19) </p><p>Install certification for sprinkler system received by the municipality.</p><p>Install certification for upgrade work to fire alarm system for 11th and 12th floor received by the municipality as well, however, A permit will need to be issued for fire alarm and plans will need to be submitted, reviewed and system witnessed prior to issuance of CO per the previous comments from prior inspection.</p> |
| 7/26/2019 | | Fire 13 | Correction(s) #1 | Please correct the following: | | 1) New ceiling tile installed required over sized escutcheons on hard piped sprinkler heads (2) Fire alarm permit required - changes to a networked fire alarm system 23.45 Appendix K K103.4 #4b. System is voice EVAC and requires voice intelligibility. Design and testing shall be approved and witnessed by AFD. (3) Need to check emergency door release. (4) NOPR issued for Criterion General and Laker Electric. |