Inspection #: 570651
Inspection Type: Private Development Site Civil
Inspector: M.Guzik
Result: Progress
Comment: PLEASE CALL EVANJELINA @ 907-787-9178 HALF HOUR PRIOR TO INSPECTION, THANK YOUSIGNED REVISED CIVIL SITE PLAN WILL BE EMAILED TO M. GUZIK AND HARDCOPIES WILL BE BROUGHT IN AFTER INSPECTION WHEN CCO IS READY FOR PICKUP. Re: Building A only: OK for Building A CCO, MG 7-5-19. The following must be resolved prior to issuance of a CCO (building A & B – lot 39): 1. The recordation of the O&M Agreement (includes O&M Plan). Resolved, MG 7-5-19. 2. Submittal of the Civil Work Asbuilt. Resolved, MG 7-5-19. 3. SDMH#1 – This manhole (stormceptor) was not found during the inspection. Inspection incomplete. Resolved, MG 7-5-19. 4. SDMH#2 – The rim elevation is high and does not receive drainage as designed. This item is partially resolved per the letter from the engineer dated 7-3-19 and is expected to be completely resolved upon final inspection. OK for CCO of building A only, MG 7-5-19. The following must be resolved prior to issuance of a CO (building A) or CCO (building B – lot 39): 5. Complete landscaping of swale (east of building A) with lead to CB#4. 6. Complete grading and landscaping of swale (west of building B) with lead to SDMH#2. 7. Complete landscaping. 8. Replace damaged field inlet casting on SDMH#2 and CB#4. Resolved, MG 7-5-19. 9. Complete grouting of CB#3 grade rings & oversize SD pipe opening, MG 7-3-19. Resolved, MG 7-5-19. 10. Inspection incomplete as of 7-1-19. 11. Complete 2:1 slopes along the north property line and establish vegetation to stabilize the slopes. MG 7-5-19.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
       
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS