Click Here To View Another Inspection Inspection #: 570558 Inspection Type: Roof Nailing Inspector: thomas.green Result: Partial Comment: Inspection for parapet wall framing and sheathing on South side of wall at 1.9 line from F.3 to G.8. M60's in H line are installed 36" OC and should have been installed 30" OC. Contractor has contacted engineer asking about spacing options. Parapet approved. Special inspector report attached. Would like a 2:45pm inspection if possible. Special inspection scheduled for 2:00pm. Inspection is for diaphragm nailing and hardware. Requested by: Bill Romesburg (907)440-6435 ceipadfield2@gmail.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments