Click Here To View Another Inspection Inspection #: 570003 Inspection Type: Roof Nailing Inspector: H.Kahlstrom Result: Progress Comment: I performed an in-progress inspection of the shear diaphragm at the roof at G-H.3 and parapet on H3/ 2.9-3.3. Inspection Corrections DateStatusCodeDescriptionRefLocationComments