| Date | Status | Code | Description | Ref | Location | Comments |
| 5/29/2019 | Transfer | INTFRAMEB | Interior framing correction | Complete the following corrections | 11th floor tenant improvement | 1) Provide lateral restraint at top of wall not extending to structure as required.
2) Replace SFPM at WF steel beams where removed or damaged by earthquake.
3) Firestop core drilled floor penetration at break area waste line. |