Date | Status | Code | Description | Ref | Location | Comments |
7/17/2019 | | FireOtherOther | Correction(s) #1 | Please correct the following item(s): | | Partial system shut down during test, strobes in some ada rooms did not synch. Some rooms the LF horns did not work. Full re-inspection required. |