| Date | Status | Code | Description | Ref | Location | Comments |
| 11/5/2019 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Project site | Remove all construction materials, equipment, and debris from site. |
| 11/5/2019 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Sprinkler/sump room under escalators | All joints must be protected/ fire caulked |
| 11/5/2019 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Ceiling | Replace GWB at rated ceiling assembly |
| 11/5/2019 | Corrected | FNLSF | NC Stairs | Maximum stair riser to be 7 3/4" and 10" minimum tread depth. | Stair between escalators | Bottom step riser does not conform to code requirement. |