Date | Status | Code | Description | Ref | Location | Comments |
1/7/2019 | | Correct Below | * | | | provide MOA stamped/approved drawings |
1/7/2019 | | Correct Below | * | | | VRU kiosk seal-offs must be poured |
1/7/2019 | | Correct Below | * | | | label panels where fed from |
1/7/2019 | | Correct Below | * | | | truck rack kiosks grounding electrode conductor must bond to disconnect and at all boxes/conduits it passes through |
1/7/2019 | | Correct Below | * | | | bond electrode at VRU kiosk transformer |