| Date | Status | Code | Description | Ref | Location | Comments |
| 1/7/2019 | Transfer | Correct Below | * | | | provide MOA stamped/approved drawings |
| 1/7/2019 | Transfer | Correct Below | * | | | VRU kiosk seal-offs must be poured |
| 1/7/2019 | Transfer | Correct Below | * | | | label panels where fed from |
| 1/7/2019 | Transfer | Correct Below | * | | | truck rack kiosks grounding electrode conductor must bond to disconnect and at all boxes/conduits it passes through |
| 1/7/2019 | Transfer | Correct Below | * | | | bond electrode at VRU kiosk transformer |