| Date | Status | Code | Description | Ref | Location | Comments |
| 6/19/2018 | Transfer | FireOtherOther | Correction(s) #1 | Please correct the following item(s): | | Advisory for spinkler obstruction in gym. Sprinkler designer to install new line at each beam and arm over under new duct due to obstruction. |
| 6/19/2018 | Transfer | FireOtherOther | Correction(s) #1 | Please correct the following item(s): | | Advisory inspection for incedental combustibles in concealed spaces in hall I-133. Section 8.15.1.2.1 out of NFPA 13 is applicable and no sprinkler coverage is required. |