Date | Status | Code | Description | Ref | Location | Comments |
4/18/2018 | Corrected | Correct Below | * | | Feeder disconnect accesss. | Tennant will need to demonstrate access by key or have written procedure for access. |
4/18/2018 | Corrected | Correct Below | * | | TI switchgear. | Label as to source of supply: Panel and disconnect number and room where feeder disconnect located. |
4/18/2018 | Corrected | Correct Below | * | | TI space water line. | Bond to building steel. |
4/18/2018 | Corrected | Correct Below | * | | RTU-1. | *Unit appears to require 25A max. OCPD. 35A installed. *Rooftop gas line and blocking need to be 3-1/2 feet from the electrical compartment access. *Label unit to show TI space it supplies and location of OCPD. Labelling to be suitable for environment. |