Date | Status | Code | Description | Ref | Location | Comments |
2/21/2018 | Transfer | HoodDuctFA | See Comments | | | (1) provide a sign at the manuel set relay on the gas line. (2) Install a relay for conductors to the hood suppresion so line integrity is possible. (3) Nozzle placement at the griddle at the main line hood needs adjustmant. (3) Complete tank and actuator at hood 3. (4) Provide nozzle caps at hood 3. (5) Need to check for auto shut down for supply air and auto fan start up upon heat rise. |
2/21/2018 | Transfer | HoodDuctFA | See Comments | | | Inspection under this permit was made to all three hoods. |