| Date | Status | Code | Description | Ref | Location | Comments |
| 5/5/2018 | Transfer | firealarm13 | Please correct the following | Please correct the following: | | All fire alarm ititating devices still need to be tested plus 10% of the existing. Problem with the alarm after alarm silenced and reset, the second alarm would not sound the horn strobes in the IMC/libary area |
| 5/5/2018 | Transfer | FireWalarmFinalOther | Fire Alarm Final Other | Please correct the following: | | Submit change order to the fire alarm plans for approval. Ordinally SLC was from West panel and now it is on the ROMING panel |
| 5/5/2018 | Transfer | firealarm13 | Please correct the following | Please correct the following: | | Hall between libary and west high strobes is out of sync by double doors per 2010 NFPA 72 section 18.5.4.3.2 (3) & (4) |
| 5/5/2018 | Transfer | firealarm1 | Provide plans | Provide approved plans on site for inspection. | | Provide approved plans at next test |
| 5/5/2018 | Transfer | firealarm2 | Install cert |
<p class="MsoNormal"><font face="Times New Roman">Provide Installation Certification and test report.</font></p>
| | Provide fire alarm installers cert |
| 5/5/2018 | Transfer | firealarm6 | FACP map | Floor plan/map required at main entry door showing location of FACP. | | Provide updated Fire Alarm Map |