Click Here To View Another Inspection Inspection #: 494230 Inspection Type: Gas Piping Inspector: Y.Dovba Result: Approved Comment: Medium pressure gas piping rough-in and test Approved. 1-Boiler, green tag not issued, tied on to existing gas piping in the building. Boiler is vented. HWS, HWR. GHS and GHR piping within boiler and header piping tests Approved. NOTE: Gas regulator is not installed at this time. Regulator will be inspected at final. Inspection Corrections DateStatusCodeDescriptionRefLocationComments