Click Here To View Another Inspection Inspection #: 485258 Inspection Type: Plumbing Rough Inspector: Y.Dovba Result: Partial Comment: Dwv and Water piping rough-in and tests Approved. Per Plans P1.1B & P.1. Highlighted, Initialed and Dated on Ralph's field set. Inspection covers all of Bar area and overhead piping within the kitchen wall, With all expansion loops in place. Both gang restrooms and single private restrooms and Lavs including overhead piping supplying restrroms. NOTE 1) Hammer arresters will be installed after testing. NOTE 2) Temp valves installed on lav piping. Inspection Corrections DateStatusCodeDescriptionRefLocationComments