Date | Status | Code | Description | Ref | Location | Comments |
8/22/2017 | Transfer | Correct Below | * | | Access to Game Stop feeder breaker. | Tennant required to have a key to th locked electrical room housing the feeder breaker. Mall management to provide letter stating that tennant will have posession of the key. Personnel on site could not demonstrate access nor produce a letter stating that the tennant will have the key . |
8/22/2017 | Transfer | Correct Below | * | | Engineering / plans. | Engineer needs to verify correct source of supply for Game Stop tennant panel. Label panel as to source of supply. Label Game Stop feeder breaker with correct space / suite number. no drawings on site. If 1-line drawings are different from actual installation, engineer needs to change drawing and submit change to MOA plan review for approval. Changed drawings with moa plan approval stamp must be on site and available to the inspector at the next site visit. |
8/22/2017 | Corrected | Correct Below | * | | Rooftop condenser unit. | 1-line dwg shows a new, 30A, non-fused disconnect, protected by a 30A breaker. Label disconnect as to source of supply and space served. Labelling must be suitable forthe environment. (Existing fused disc. does not have working clearances, cannot determine fuse sizes. EGC not bonded to enclosure, 40A breaker supplies unit.) |
8/22/2017 | Corrected | Correct Below | * | | Sales floor. | (2) EM battery back-up troffers not functioning in emergency mode. EM battery packs on order. (2) other EM troffers are functioning. AFD may not approve a conditional final with (2) of (4) EM lights functioning. |