Click Here To View Another Inspection Inspection #: 457684 Inspection Type: Private Development Site Civil Inspector: M.Guzik Result: Progress Comment: The following must be resolved prior to issuance of a CCO (building A & B – lot 39):1. The recordation of the O&M Agreement (includes O&M Plan).2. Submittal of the Civil Work Asbuilt.3. SDMH#1 – This manhole (stormceptor) was not found during the inspection. Inspection incomplete.4. SDMH#2 – The rim elevation is high and does not receive drainage as designed.The following must be resolved prior to issuance of a CO (building A) or CCO (building B – lot 39):5. Complete landscaping of swale (east of building A) with lead to CB#4.6. Complete grading and landscaping of swale (west of building B) with lead to SDMH#2.7. Complete landscaping.8. Replace damaged field inlet casting on SDMH#2 and CB#4.The following must be resolved prior to issuance of a CO (building A & B – lot 39):9. Complete grouting of CB#3 grade rings.10. Inspection incomplete as of 7-1-19. Inspection Corrections DateStatusCodeDescriptionRefLocationComments