Date | Status | Code | Description | Ref | Location | Comments |
5/26/2017 | Corrected | INTFRAMEB | Interior framing correction | Complete the following corrections | AMERICAN EAGLE | 1**PROVIDE MOA STRUCTURAL PLAN REVIEW APPROVAL FOR METAL STUD WALLS OVER 9'-0 IN SEISMIC D-3 INCLUDING ATTACHMENT DETAIL @ TO STRUCTURE 2**SUBMIT LIFE SAFETY PLAN FOR DEMIZING WALLS IN OR ADJACENT RATED CORRIDOR FOR 1-A construction |
5/26/2017 | Corrected | INTFRAMEC | See Inspector comments | Inspector comments | AMERICAN EAGLE | 1**PROVIDE MOA STRUCTURAL PLAN REVIEW APPROVAL FOR METAL STUD WALLS OVER 9'-0 IN SEISMIC D-3 INCLUDING ATTACHMENT DETAIL @ TO STRUCTURE 2**SUBMIT LIFE SAFETY PLAN FOR DEMIZING WALLS IN OR ADJACENT RATED CORRIDOR FOR 1-A construction |