Date | Status | Code | Description | Ref | Location | Comments |
5/9/2017 | Transfer | EXTFRAMEC | See Inspector comments | Inspector comments | restroom 101/ stockroom 102 | 1**floor penatration for closet flange penatrating 2 hour floor /ceiling assembly requires protection of thru penatration 2hr with F&T rating including fire caulking all thru floor penatrations inside wall cavitys. wall framing connections at pandeck above will need to repair mono kote to be repaired. metal framing to be approved after corrections of fire separation. recall |