Date | Status | Code | Description | Ref | Location | Comments |
1/5/2017 | | Fire 13 | Correction(s) #1 | Please correct the following: | hood fryer appliance | Verify the required clearance between the fryer and the side wall. Curently there is zero clearance. Show either the code section, appliance listing, etc allowing this. Verbal approval by previous inspector/inspection not valid unless in writing. |
1/5/2017 | | Fire 13 | Correction(s) #1 | Please correct the following: | Pho Vietnam | Install did not match approved plans. angled wall squared off and door added. Provide a change order for wall, door thumbturn hardware & sink blocking door. |
1/5/2017 | | Fire 13 | Correction(s) #1 | Please correct the following: | Pho Vietnam hood | add a baffel between the stove and fryer. remove duct tape from hood intake vent. |