| Date | Status | Code | Description | Ref | Location | Comments |
| 4/4/2017 | Transfer | ROOFN | NC ventilation | Provide minimum low/high end roof ventilation per IRC | roof boundry nailing ,sheeting | roof boundry nailing and truss brace framing above shear walls top plate installed and nailed thru sheeting per plan . provide adequate venting at eves per detail . will check corrections at exterior shear inspection |