Click Here To View Another Inspection Inspection #: 425289 Inspection Type: Plumbing Inspection Inspector: K.Hanson Result: Approved Comment: Final Tie in of oxygen in dry storage, 1-air & 1-oxy iso valve on 2nd fl. surgery corridor, 1-air, 1-vac, & 1-oxy iso valve on 2nd fl. PACU (recovery), 1-air & 1-oxy iso valve on 3rd fl. public elevator lobby, 1-air & 1-oxy iso valve on 4th fl. public elevator lobby, 1-vac, 1-air, & 1-oxy iso valve on 5th fl. public elevator lobby, & 1-vac, 1-air, & 1-oxy iso valve on 1st fl. public elevator lobby. NOTE: Valve tags to be supplied by hospital, contractor will install as soon as tags arrive. Inspection Corrections DateStatusCodeDescriptionRefLocationComments