Click Here To View Another Inspection Inspection #: 411805 Inspection Type: Plumbing Rough Inspector: H8 Result: Partial Comment: Compliance inspection conducted on 6th floor for superior plumbing. Mechanical: Per 2012 IMC section 607.3 all FSD must be tested & section 607.4 access and identification. Per 2012 IMC section 607.5.4 dampers must be installed where required per building code. Per 2012 IMC section 603 through 603.10 all duct work must be adequately supported per SMACNA HVAC including flex duct. Plumbing: Medgas piping & alteration must be installed per 2012 NFPA and third party inspection required for any alteration. Per 2012 UPC section 408.7 all man made showers must be tested & inspected prior to covering. Per 2012 UPC section 609.10 hammer arresters required at all quick-acting valves. Per 2012 UPC section 313.0 through 313.6 all piping must be adequately supported. Inspection Corrections DateStatusCodeDescriptionRefLocationComments