Click Here To View Another Inspection Inspection #: 347477 Inspection Type: Framing Inspector: P.Calhoun Result: Approved Comment: would like a late pm inspection if possible Requested by: mark motoyama 350-7470 mmotoyama@neeserinc.com PHASE 1A - METAL STUD WALL FRAMING APPROVED Inspection Corrections DateStatusCodeDescriptionRefLocationComments 3/13/2015 FRAMSNot ReadyComplete all plumbing, Mechanical and Electrical rough-ins, RECALL. PROVIDE APPROVED FIRESTOP ASSEMBLY FOR FLOOR PENITRATIONS AND LISTING FOR RATED WALL