Click Here To View Another Inspection Inspection #: 342671 Inspection Type: Electrical Rough Inspector: H8 Result: Partial Comment: PM CALL 20 MIN B4- ESCORT? Requested by: SEAN 350-5989 Conditional electrical final approved until 2-17-2015. Original scope of work was (1) 30A espresso machine ckt and 120V ckt to exhaust fan. 120V syrup pump receptacle added to exhaust fan ckt without engineering. Engineer needs to submit change order to MOA plan review. Correction: 000 Electrical Rough Other Note: Approved drawings need to show 120V recept for espresso syrup pump on exhaust fan ckt with 11A load. Inspection Corrections DateStatusCodeDescriptionRefLocationComments 2/3/2015TransferElecRoughOther000 Electrical Rough OtherPlease correct the following:PlansApproved drawings need to show 120V recept for espresso syrup pump on exhaust fan ckt with 11A load.