| Date | Status | Code | Description | Ref | Location | Comments |
| 12/11/2014 | Transfer | EC1 | Correct Below | | basement | basement corridor lens covers must be able to open |
| 12/11/2014 | Transfer | EC1 | Correct Below | | basement | remove temp lighting from lids |
| 12/11/2014 | Transfer | EC1 | Correct Below | | basement | south bathrooms incomplete |
| 12/11/2014 | Transfer | EC1 | Correct Below | | basement | breaker lock at facp breaker |
| 12/11/2014 | Transfer | EC1 | Correct Below | | basement | no power at mens room light |
| 12/11/2014 | Transfer | EC1 | Correct Below | | basement | bonding bushings at motor controllers |
| 12/9/2014 | Transfer | EC1 | Correct Below | | in penthouse | bond around knockouts in disconnect for elevator 2 |
| 12/9/2014 | Transfer | EC1 | Correct Below | | in penthouse | fused disconnect for elevator lighting may not be over edge of housekeeping pad |
| 12/9/2014 | Transfer | EC1 | Correct Below | | in penthouse | need to verify that Oliver inspected transformer grounding and bonding |
| 12/9/2014 | Transfer | EC1 | Correct Below | | in penthouse | no apparent third party listing, input and output ratings on VFDs |
| 12/9/2014 | Transfer | EC1 | Correct Below | | on rooftop | bond around knockouts at disconnect for EF-1 |
| 12/9/2014 | Transfer | EC1 | Correct Below | | on rooftop | all recptacles must be weather resistant and have extra duty in-use covers |